Energy · Artemisa
CTE Máximo Gómez (Mariel)
Thermoelectric power plant (oil-fired)
🔴 Stateℹ️ Atlas — info only
Scale
~400 MW nameplate (Soviet-era ~90 MW units; effective output far lower)
Status
Severely degraded 2025-2026. A 2022 fire knocked out Units 6-7 (~170 MW); Unit 6 returned then went offline again Sept 2025 on oil contamination and pump faults. Chronic outages. Opportunity: full retrofit/repowering.
Sector
Energy
Province
Artemisa
Coordinates
23.022, -82.750
Layer
Layer 2 · Atlas
Notes
Operated by Unión Eléctrica (UNE) under MINEM via the SEN national grid.Controlling entity
National electric utility under the Ministry of Energy and Mines. Owns the thermoelectric fleet, the China-backed solar program and wind farms. State-owned and embargo-restricted, though not itself on the CRL/SDN.
Sources: Global Energy Monitor · CiberCuba · OpenInfraMap · Cubadebate